By using the below formula, an industrial engineer can easily calculate the
required garments sewing time from machine RPM.
Machine cycle time = Stitch per inch (SPI) x Seam length in inch x 60
or sewing time (in second), ..........................................................................................
Sewing Machine RPM
If we see an example then concept will be clear,
If a plain stitch sewing machine RPM is 1400. How much time needed to sew a 50 inch length seam, where stitch per inch (SPI) is 8?
Solution:
Sewing machine RPM= 1400, Seam length in inch= 50”, Stitch per inch (SPI) = 8
we know that,
Machine cycle time = Stitch per inch (SPI) x Seam length in inch x 60
or sewing time (in second) ..........................................................................................
Sewing Machine RPM
= 8 x 50 x 60
…………………
1400
= 24000
…………
1400
Sewing time of that machine = 17.14 sec